Skip to content

Building a Home

Track building inspections and walkthrough items

Keep inspection results, issues and walkthrough evidence with the work and review them before acceptance.

How to use it

  1. Open the construction project and Quality & walkthrough. Add an inspection, issue or walkthrough item with its description and available supporting evidence.
  2. Track inspections as scheduled, passed or corrections required. Reschedule after corrections when another inspection is needed.
  3. Track issues and punch-list items through assignment, in-progress work and ready-for-review status. Record the work and evidence before requesting homeowner acceptance.
  4. Review each item and its source before accepting it. A status records the participants’ review; it does not certify building safety or replace an independent inspection.
  5. Keep unresolved items visible when preparing Home records & handover. Do not mark them accepted merely to remove them from the list.

Active construction collaboration requires the household’s Ark+ entitlement. Household roles and builder permissions still apply. Existing history is preserved when access changes.

Related guides